Friday, June 8, 2012

The Real Engineering Project Interaction

Project Manager: Okay guys, lets make an unmanned technologically advanced plants that are safe with high yield and LOW COST  in less than a year( with a little number of engineer, no support groups (drafting, computer services, purchasing, etc) and a large number of managers).

Process Engineer: We need you to calculate and design a control valve with the  40 barg pressure drop in 2" line pipe under the choked flow condition.

Mechanical Engineer: We managed to purchase low cost packaged equipment without any electrical drawing, Could you make the shop drawing for us?

Electrical Engineer: We want to put electrical heat tracing on the UPS.

Piping Engineer: We forgot to isolate the pressure transmitter during hydrotest.

Safety Engineer: We want to put water sprinkles in the control room because its cheaper

Instrument Engineer: Arrrrrrrrggggggggggggghhhhhhhhhhh